Siwa-Matrouh Kifar Omessaghir Pipelines
PROJECT DESCRIPTION
The project included research and soil tests for the areas of building of the pipelines. The first with a length of 320 KM from Matrouh to Siwa and the other with a length of 50 KM from Kifar to Omessaghir.
Scope of services include:
Application of the groundwater simulation model to divine economic water use until the year 2085Research and soil tests
Design of two major pipe lines for providing water to the new areas
Preparing tendering documents