Study of Soil Properties for 70 tons Bridge on Salam Canal
PROJECT DESCRIPTION
A study is concerned with the soil properties for a 70 tons bridge on Salam Canal. The study covered the physical and chemical properties for the construction site of the bridge at Serw area at KM 135.
Scope of services included Laboratory tests, Proposing recommendations for the type and depth of foundation with determination of allowable loads on the foundation level, Providing the general and specific recommendations for design of foundations, Advising of the precautions that should be considered during the execution of construction.