Rehabilitation Movable Bridge over Damietta Lock
PROJECT DESCRIPTION
The bridge was supposed to operate manually and electrically; however due to the damage of the opening and closing cylinders of the bridge is doesn’t function at all. The PLC units responsible for operating the bridge from the main control room of operating the bridge, the barrage was damaged. The unit of operating the bridge from the subsidiary panel located at one of the edges of the barrage is also damaged.
Scope of services included Review of the existing structural system, Calculation of the storming actions, Preparing design, calculation notes, Preparing all tender drawings and documents.