Iron Oxide Pellets Terminal, Sokhna Port
PROJECT DESCRIPTION
DPWS has assigned to PACER Consultants the construction supervision of the works.
PACER Consultants has applied a design review on the tender package, applied fine adjustments, inspected and approved the works performed on site, approved materials of the permanent works, administer and witness all tests performed during the construction and applied testing and commissioning.
DPWS has decided to shift the stockpile area of the new Iron Oxide Pellets Terminal 136m to the backside of the terminal.
Due to the slope of the bulk terminal area, the level of stockpile area will increase 1m. The belt conveyor BC2, which is running from the quay to the stockpile, will be extended with 136m (+1m elevation) and the road network around the terminals will be changed.