72 Mossadak st, Dokki, Giza 12311, Egypt +2 (02) 3748 4835 Sun - Thur 8am - 5pm
Follow us
PACER
  • HOME
  • ABOUT US
    • Who We Are
    • Team
    • Organization Chart
    • Corporate Social Responsibility
  • SERVICES
    • Design
    • Management
    • Studies
  • PROJECTS
    • Residential
    • Commercial
    • Industrial
    • Maritime
    • Infrastructure
  • CLIENTS
    • Clients
    • Partners & Joint Ventures
  • CONTACT
Home | Projects | Infrastructure

Infrastructure | Storage of Winter Closure Nile Water in Lake Burullus

Storage of Winter Closure Nile Water in Lake Burullus

  • Client Ministry of Irrigation
  • Surface Area N/A
  • Location Egypt
  • Affiliate None
Image
PROJECT DESCRIPTION

About 1.8 milliard cubic meters are spilled into the Mediterranean sea every year through Rosetta branch during the winter closure period.

Scope of services included:

Six scenarios were investigated considering providing the entire area of the lake on its western part with different water levels
Carrying out the preliminary engineering design of the required infrastructure
Preparation of engineering cost estimates

Back to Infrastructure Projects

RELATED PROJECTS

Image
Study of Soil Properties for 70 tons Bridge on Salam Canal
Infrastructure
Image
50 Liters/Second Water Pump Station in Mazata
Infrastructure
Image
West Nobariya & North-West Coast Land Reclamation
Infrastructure
Image
Completion of the 2nd Pipeline Extension from Imbaba Water Pump Station to Rimayah Club
Infrastructure
Image
300 Liters/second Water Pump Station in Nobaria and Galia Villages
Infrastructure

Image

Over 60 years of experience.

  • 72 Mossadak st, Dokki Giza 12311, Egypt
  • +2 (02) 3748 4835
  • projects@pacer-consultants.com

RECENT NEWS

  • Image

    MARASSI MARINA

    Oct 2021
  • Image

    SOKHNA BASIN 2

    June 2021

RECENT PHOTOS

Image
Image
Image
Image
Image
Image
© PACER Consultants
  • HOME
  • ABOUT US
  • SERVICES
  • PROJECTS
  • CLIENTS
  • CONTACT