Container Yard, Port Said West
PROJECT DESCRIPTION
PACER provided detailed design and preparation of tender documents and construction supervision.
Port Said Container and Cargo Handling Co. has assigned to PACER Consultants the design and supervision of a new yard in Port Said West with a total area of 172,000 m2 .
The work included dry excavation with a depth of 2.6 meters and an area of 172,000 m2 and a total volume of 450,000 cubic meters, 96,000 m2 paving works, 65,000 m2 fiber reinforced slabs, 150 tons weigh bridges, high masts firefighting networks, utilities and fences.